Click a thumbnail to view project details
Up
Down
 

Dianne G. Van Hook University Center

College of the Canyons
The first of its kind in California, the 110,000 square foot, high technology center is a place where several four-year universities offer their bachelor’s, master’s and doctoral programs to students right here in the Santa Clarita Valley. The new University Center is situated on the southwest corner of the campus overlooking Interstate 5 and has 23 so-called “smart” classrooms, two computer laboratories, six meeting/seminar rooms and a lecture hall/theater. Additionally, wireless and video teleconferencing capabilities exist throughout the entire building.
Architect:   Flewelling & Moody
Square Footage:   110,000
Location:   Valencia, CA

Allied Health & Aviation Lab Building

Glendale Community College
The Allied Health and Aviation Laboratory Building when finished will house computer animation and graphics classes, nurse training facilities and Facilities Maintenance and Operations. The project consists of a three-story main building with a partial basement. The structure is primarily constructed from cast-in-place concrete with the upper floors also integrating structural steel. The hillside location allows for ground level access from each floor. Two elevators provide disabled access to all programs in the new building. In addition to the lecture halls and offices, the third story will have eight patient care beds simulating a hospital setting for a more “real world” learning experience.
Architect:   Spencer/Hoskins Associates
Square Footage:   n/a
Location:   Glendale, CA

Hoover High School Modernization

Glendale Unified School District
Lundgren completed the successfull six-phase modernization of Hoover High School over two years. Modernization included ADA upgrades, elevator towers, electrical and plumbing upgrades throughout, construction of a new rally quad and school entrance, locker rooms and showers, etc. This project was managed utilizing the Agency CM over GC delivery method.
Architect:   LHA/Gkk Works
Square Footage:   100,000 +
Location:   Glendale, California

Cultural & Performing Arts Center

San Luis Obispo Community College District
This $26 Million project consisted of the construction of a new 449-seat theater facility including an entrance, lobby, stage, an elevating orchestra pit, rehearsal area, prop construction area, changing rooms, experimental theater room, costume sotrage rooms and an outdoor scenery construction area. The state-of-the-art digital sound system is the most technologically advanced systems on the central coast. This project was managed utilizing the multiple prime delivery method.
Architect:   NTD
Square Footage:   38,000
Location:   San Luis Obispo, California

Ontario Convention Center

Ontario Convention Center Corp.
Working closely with the Design/Builder, Lundgren established a quality control management program and implemented a project control process that allowed the project to be completed per the original schedule, and mitigated outstanding claims.
Architect:   HMC Architect Group
Square Footage:   250,000
Location:   Ontario, California

Clinicas Del Camino Real

Clinicas Del Camino Real, Inc.
Lundgren Management managed the planning, design and construction of four Clinicas Del Camino Real medical facilities. Each facility was constructed within existing k-14 campuses, requiring Lundgren to coordinate the construction operations with school district personnel and school-site administration.
Architect:   Lauterbach & Associates
Square Footage:   23,000
Location:   Ventura, California

Library Remodel & Expansion

San Luis Obispo Community College District
This $13.5 million, 35,002 square foot addition to the college’s main library and student services on the San Luis Obispo Campus reconstructs the existing Library/Administration Student Services Building, addressing a critical shortage of space for the library and Student Services. It provides space for a Curriculum Innovation Center and the District’s Main Data Processing Center, along with office space for the Health Center, Instructional Services, Employee Learning and Innovation Center, Computer Services and General Services.
Architect:   Spencer/Hoskins
Square Footage:   35,002
Location:   San Luis Obispo, CA

Aliso Laboratory & Lecture Hall

Santa Clarita Community College District
The Laboratory Expansion Project is a GO Bond-funded (Measure C) project that includes the construction of a 43,463 sq. ft. expansion of the L-Building as outlined in the Facilities Master Plan for the College. The expansion will provide additional laboratory space for programs currently existing in the building with the addition of Allied Health as well as offices and other support spaces required for the program. Lundgren Management provided Multi-Prime Construction Management Services for the project.
Architect:   Leo A. Daly
Square Footage:   32,000
Location:   Santa Clarita, CA

Endeavor School @ Troy High School

Fullerton Joint Union High School District
This project consisted of a new classroom building composed of six classrooms, one daily living skill classroom, two shower/changing rooms, and four boys and four girls restrooms. Other tasks of the project included site grading improvements and a new power service. Lundgren provided design and construction management services using the multiple prime delivery method.
Architect:   Henry Woo Architects
Square Footage:   10,000
Location:   Fullerton, CA

Cimmarusti Science Center & Planetarium

Glendale Community College District
The complete renovation and expansion program of the College's Science Center included new lecture halls and laboratories for the Geology, Oceanography, Physics, Anthropology, Geography, Chemistry and Math departments. The State of the Art Planetarium and Digital Theatre was partially funded by a grant from the National Aeronautics and Space Administration (NASA).
Architect:   Spencer/Hoskins Associates
Square Footage:   n/a
Location:   Glendale, California

Alice C. Stelle Middle School

Las Virgenes Unified School District
New construction of this middle school took place on a 31-acre site that included an Administration Building, Library, Gymnasium/Multipurpose Room, Food Services Facility, Classroom Buildings and parking for over 200 vehicles. Lundgren's value engineering recommendation that the District use an existing water well for irrigation resulted in thousands of dollars in annual savings in water and equipment maintenance costs.
Architect:   tBP Architects
Square Footage:   100,000
Location:   Calabasas, CA

La Mesa Junior High School

William S. Hart Union High School District
New construction of the District's third Junior High School was completed within the original 14 month duration despite a change in site conditions during earthwork operations. Lundgren Management contained added costs and mitigated potential claims.
Architect:   NTD Architects
Square Footage:   n/a
Location:   Santa Clarita, California

Calabasas High School

Las Virgenes Unified School District
New construction of this two-story Administration, Music and Lecture Hall was completed on operating campuses with minimal disruption to school operations. The modernization to an existing classroom building and new construction of a shower, locker room and dance facility was also completed during the school year and completed within the original construction schedule.
Architect:   tBP Architecture
Square Footage:   90,000
Location:   Calabasas, California

Moorpark Unified School District

Moorpark Unified School District
This beautiful two-story facility included an official league-sized basketball and volleyball court, seating for 2,500, a weight room, wrestling room and food preparation area.
Architect:   PSWC Architects
Square Footage:   39,000
Location:   Moorpark, California

Nordhoff High School

Ojai Unified School District
This project included demolition of existing buildings and infrastructure upgrades in addition to new construction of the Administration, Music and Science Buildings.
Architect:   Merrick Planning & Architecture Group
Square Footage:   24,000
Location:   Ojai, California

Sequoia Elementary School

Richland School District
This new Elementary School is set on a 25-acre site and includes an Administration Building, Multipurpose Building, 24 classrooms and athletic fields. Lundgren Managament provided master planning as well as management of the construction phase.
Architect:   Ordiz-Melby Architects, Inc.
Square Footage:   38,259
Location:   Shafter, California

Sierra Vista Boys & Girls Club

William S. Hart Union High School District
This joint use facility included an expansion to the Sierra Vista Junior High School campus and addition of a new Boys and Girls Club. A collaboration between the William S. Hart School District, City of Santa Clarita and the Boys and Girls Club of Santa Clarita, the project was comprised of new classrooms and science labs, a new gymnasium and full-sized basketball court, arts and crafts center, computer labs, sports fields and track.
Architect:   NTD Architects
Square Footage:   27,000
Location:   Santa Clarita, California

Home Economics Room

La Cañada Unified School District
Lundgren Management is currently working with the District on the continued modernization of La Cañada High School. We are providing construction management services using the CM/GC delivery method. Lundgren recently completed a $3 million modernization of the school’s band and home economics rooms. Work was completed over a ten month duration on time and within budget. A ribbon cutting ceremony was held on December 14th for the completion of the Home Economics room and again on March 2nd for the completion of the Band Room. Lundgren has been asked to continue assisting the District with various modernization projects, currently the second and third floors of Building B at La Cañada High School.
Architect:   Osborn Architects
Square Footage:   n/a (Modernization)
Location:   La Cañada, CA

Aptek Laboratories

Aptek Laboratories, Inc.
Lundgren Management provided oversight, project management, scheduling, inspections and closeout for the construction of this two-story, concrete tilt-up structure used by Aptek Labs to manufacture military and space-grade high performance polymer systems and adhesives.
Architect:   Shook Building Systems
Square Footage:   39,000
Location:   Valencia, California

Valencia High School

William S. Hart Union High School District
The schedule for the District's fourth High School was expedited to accommodate major technology upgrades and changes that were introduced into the project after construction had commenced. Lundgren Management successfully isolated critical aspects of the Owner/Architect added modifications and mitigated potential project delays. The project completed within the original construction schedule with no claims.
Architect:   NTD Architects
Square Footage:   n/a
Location:   Santa Clarita, CA

FUSD Modernization Program

Fontana Unified School District
Lundgren Management is working with the Fontana Unified School District providing both design and construction management services using the multi-prime delivery method. This project consists of the modernization of six schools. The construction is taking place while school is in session and is part of the District's Master Plan for their facility needs.
Architect:   KPI Architects
Square Footage:   n/a
Location:   Fontana, CA

Adolfo Camarillo High School

Oxnard Union High School District
Lundgren Management managed the modernization of the District's (4) High Schools in occupied campuses over two phases. Scope of work included complete modernization of all classroom and ancillary structures, ADA compliance, upgrades to the underground utilities and new walkways.
Architect:   Fields Devereaux Architects & Engineers
Square Footage:   n/a
Location:   Camarillo, California

Dysinger Elementary School

Centralia School District
This project was part of a modernization of nine elementary schools for the Centralia School District. Work was performed while school was in session for the 5,100+ student district covering the areas of Buena Park, La Palma and Anaheim.
Architect:   LHA Architecture
Square Footage:   n/a
Location:   Centralia, CA

Agoura Business Center

The Dale POE Real Estate Group
This two-story office building and business park was completed within ten months. Despite Owner and Architect added changes that were made to the plans and specifications during construction, Lundgren Management expedited the schedule and met the original timeline without any additional cost to the Owner.
Architect:   Lauterbach & Associates
Square Footage:   76,000
Location:   Agoura Hills, California

Hart High School Auditorium

William S. Hart Union High School District
The reconstruction and addition to the Hart High School's existing 900-seat Auditorium included a new orchestra pit and lift, replacement of the stage and lighting and audio systems, soundproofing, new seating as well and other new interior finishes.
Architect:   NTD Architects
Square Footage:   n/a
Location:   Santa Clarita, California

Bard & Beach Elementary Schools

Hueneme School District
To minimize disruption to the educational process, the modernization of Richard Bard Elementary and Beach Elementary was performed over four continuous phases. Completion of the administration buildings was performed over the summer break.
Architect:   Lauterbach & Associates
Square Footage:   n/a
Location:   Port Hueneme, California